Case Study

Discovery Elementary

Discovery Elementary

Currently experiencing a population boom, Arlington County is facing massive growth in the next decade and is seeking to add half a million square feet in educational facilities. During competitive design procurement, one of the teams suggested a zero energy goal could be accomplished within the given budget. Proponents at the district level who had been championing energy efficiency were receptive because sustainability was a core value of the project from the start, but they were skeptical that it could be done within the budget aimed at LEED Silver. Not only did the project end up coming under budget, including the solar array, but the building is more efficient than originally predicted.

Friends School of Portland

Friends School of Portland

More than half of all operating school districts in the U.S. are in rural areas. These small schools operate at a different scale and have different needs than their city counterparts. In 2003–2004, 20% of public schools in the U.S. served fewer than 200 students. Although the Friends School of Portland—which was designed to achieve both zero energy performance and Passivhaus certification—is an independent school, it faced financial constraints similar to those faced by many other small schools throughout the country. The project was financed through a capital campaign and a mortgage that forced a hard cost cap on the project, so the project team had to be diligent about every dollar.

Odyssey Elementary

Odyssey Elementary

Odyssey Elementary is a large public school in an area of Utah with a growing population. Created as a prototype for the Davis School District, Odyssey is a zero energy building whose design has already been copied for two other new schools, both of which are targeting zero energy. It has a unique design with four “houses” (or classroom wings) featuring generously daylit classrooms. This design contributes to the school’s energy efficiency.

Lady Bird Johnson Middle School

Lady Bird Johnson Middle School

This 150,000 SF, LEED Gold, Net Zero facility was built on a 17.5 acre site in the city of Irving, Texas. Project cost was $29,610,423, and construction commenced on May 14, 2010. The project opened its doors for school on August 24, 2011. The building is structural steel frame with a brick and metal panel veneer. There are large expanses of windows for daylight harvesting. The structure fits on a very tight site with building orientation critical to energy conservation; native landscaping and pervious paving round out the exterior. The school uses extensive shading to minimize solar heat gain and incorporates wind turbines as a part of its onsite renewable energy generation portfolio.

Richardsville Elementary School

Richardsville Elementary School

Richardsville Elementary School is the first full-scale zero energy K-12 school in the United States. The school building, located in Kentucky's Warren County Public School District, uses many innovative strategies to conserve energy, including dedicated outdoor air systems (DOAS) with dynamic reset, insulated concrete form (ICF) wall construction, daylighting, and ground-source heat pumps, among others. The school has both thin-film and crystalline silicon photovoltaic panels.